|
Paper
|
Title, Authors
|
PDF
|
PPT
|
| |
Session A: Setting the Scene – Chaired by J. Van der Steen (The Netherlands) |
|
|
|
A1
|
Introduction and setting the scene C. Lefaure, P. Shaw |
|
|
|
A2
|
Following up of former recommendations P. Deboodt |
|
|
| |
Session B: Site Remediation – Chaired by G. Morkunas (Lithuania) |
|
|
|
B1
|
The role of ALARA in management decisions J.A.M.M. Kops |
|
|
|
B2
|
Management of industrial sites contaminated with radionuclides in France A. Oudiz |
|
|
|
B3
|
Methodology for estimating the doses to members of the public from contaminated land W.B. Oatway |
|
|
|
B4
|
Restoration of the former site of the institute for nuclear physics research in Amsterdam P.W.F. Louwrier |
|
|
| |
Session C: Site Remediation and Prevention of Internal Exposure – Chaired by P. Deboodt (Belgium) |
|
|
|
C1
|
Occupational exposure during site remediation at WISMUT P. Schmidt |
|
|
|
C2
|
Clean-up of a GBq-Pu contamination of two appartments, contaminated by the Pu theft at the WAK (Pilot Reprocessing Plant – Karlsruhe) P. Höfer |
|
|
|
C3
|
The Olen radium facility: environmental contamination, impact on the population and site remediation H. Vanmarcke |
|
|
|
C4
|
The role of personal protective equipment in reducing occupational exposure T.A.J. Bain |
|
|
| |
Session D: Decommissioning of Installations outside the Nuclear Fuel Cycle – Chaired by H. Troen (Danmark) |
|
|
|
D1
|
Dismantlement of the Amsterdam 700 MeV linear electron accelerator MEA, electron storage ring AmPS and the experimental halls P.W.F. Louwrier |
|
|
|
D2
|
Melting of 137Cs and 60Co sources in a steel plant: remediation and environnement monitoring V. Berna |
|
|
|
D3
|
Radiological survey of the active central laboratory (ACL) in Studsvik, Sweden H. Effraimsson |
|
|
|
D4
|
Operational aspects of decommissiong of installations concerning mineral wool E.I.M. Meijne |
|
|
|
D5
|
Dose reduction techniques employed during cell line decommissioning I. Pearman, A. Murray |
|
|
| |
Session E: Effectiveness and Feedback on the use of Dose and Dose Rate Estimating Tools – Chaired by Vincent Massaut (Belgium) |
|
|
|
E1
|
Dismantling of the hot-cell n° 41 at the SCK-CEN, using the ALARA planning tool VISIPLAN P. Antoine |
|
|
|
E2
|
Calculation codes for decommissioning C. Le Goaller |
|
|
|
E3
|
The EDR gamma scanner J.M. Pérez |
|
|
|
E4
|
Gamma imaging as a complementary technique to health physics monitoring K. Hughes |
|
 |
|
E5
|
The use of a waste conversion index as a long term performance indicator for civil nuclear liabilities P. Fawcett |
|
|
| |
POSTERS |
|
|
|
P1
|
Review of dose criteria for cleaning of contaminated land S. Mobbs |
|
|
|
P2
|
ALARA aspect in decommissioning/moving a storage of nuclear waste (low activity) and remediating the ground H. Troen |
|
|
|
P3
|
Problems in optimization of radiation protection concerning site remediation: case study G. Morkunas |
|
|
|
P4
|
The use of functional modelling in a safety audit of radioactive flows J. Lundtang Paulsen |
|
|
|
P5
|
Regulatory aspects regarding decommissioning of nuclear facilities in Switzerland S.-G. Jahn |
|
|
|
P6
|
Development of fit for purpose safety cases for decommissioning activities P. Manson |
|
|
|
P7
|
Decommissioning of the nuclear facilities at Risoe National Laboratory in Denmark M. Bagger Hansen |
 |
|
|
P8
|
The combined use of 3D dose assessment and the human motion simulation in ALARA D&D problems F. Vermeersch |
|
|